factory Outlets for Composite Lay-Up Fixtures - Assembly Checking Fixture for Metal Stamping Parts – TTM


Product Detail

Product Tags

Related Video

Feedback (2)

carry on to further improve, to guarantee merchandise high-quality in line with market and buyer standard necessities. Our organization has a top quality assurance procedure have already been established for Tooling Fixture, Assembly Tooling & Fixturing, Gage Fixture, It is our great honor to meet your demands.We sincerely hope we can cooperate with you in the near future.
factory Outlets for Composite Lay-Up Fixtures - Assembly Checking Fixture for Metal Stamping Parts – TTM Detail:

Function

Old version single checking fixture, it is a set of inspection tools can only be applied to a single model, detection function. A deficiency, such as a deficiency; And the degree of automation is low. The production of different models need different inspection tools, and each set of inspection tools occupies a large space area, which brings inconvenient user management and high production cost. The technical problem to be solved by the utility model is to provide an assembly checking fixture.

Application field

Automotive industry quality control.
Automotive production line production capacity improve.

Product Details

Assembly Checking Fixture for Metal Stamping Parts
Assembly Checking Fixture for Metal Stamping Parts

Specification

Fixture Type:

Assembly CF for Metal Stamping Part

Size:

4650x850x3400

Weight:

3550 KG

Material:

Main Construction: metal

Support: metal

Detailed Introduction

This is the vehicle function parts assembly check fixture model. The product is a large injection molded part. After the assembly of various parts and circuit boards is completed, it is put into the inspection tool for batch inspection. It is the last process before production and packaging after functional testing. Inspection tools include: 0 position plane, 3mm gap detection position, difference gauge, gap detection gauge, reference block, body coordinate system, etc

Engineering & Design

Research and Development
Design Concept&Proposal
In-house design & detail services
3D parametric solid modeling
2D Drawing Building
FEA analysis available
On-line web conference design review
Engineering Change Technical Support
Design Software: UG(Unigraphics NX)
Catia and Autodesk-Auto-CAD
Our deign team will take project responsibility system to manage all of the projects from our customers.
Project leaders with at least 10 years experience in this industry will take care of every project.
Project leader: 12 years experience, 5 people
Designer: 5 to 8 years experience, 12 people; 3 to 5 years experience, 7 people; 1 to 2 years experience, 6 people

The Working Flow

1. Received the purchasing order -——-> 2. Design -——-> 3. Confirming the drawing/solutions -——-> 4. Prepare the materials -——-> 5. CNC -——-> 6. CMM -——-> 6. Assembling -——-> 7. CMM-> 8. Inspection -——-> 9. (3rd part inspection if need) -——-> 10. (internal/customer on site) -——-> 11. Packing(wooden box) -——-> 12. Delivery

Lead time & Packing

45 days after 3D design approved
5 days via express: FedEx by Air
Standard Export Wooden Case


Product detail pictures:

factory Outlets for Composite Lay-Up Fixtures - Assembly Checking Fixture for Metal Stamping Parts – TTM detail pictures

factory Outlets for Composite Lay-Up Fixtures - Assembly Checking Fixture for Metal Stamping Parts – TTM detail pictures


Related Product Guide:

All we do is usually connected with our tenet " Consumer initial, Rely on 1st, devoting around the food stuff packaging and environmental safety for factory Outlets for Composite Lay-Up Fixtures - Assembly Checking Fixture for Metal Stamping Parts – TTM , The product will supply to all over the world, such as: Jeddah, Moscow, Kuala Lumpur, We believe with our consistently excellent service you can get the best performance and cost least goods from us for a long term . We commit to provide better services and create more value to all our customers. Hope we can create a better future together.
  • The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
    5 Stars By Dee Lopez from Kuwait - 2017.11.11 11:41
    The product manager is a very hot and professional person, we have a pleasant conversation, and finally we reached a consensus agreement.
    5 Stars By Mavis from Ghana - 2018.06.03 10:17