Best quality Welding Jig And Fixture - Automated Welding Jig Fixture , 630kg Front Cover Weld Fixture Components – TTM
Best quality Welding Jig And Fixture - Automated Welding Jig Fixture , 630kg Front Cover Weld Fixture Components – TTM Detail:
Base Supporter: |
Steel |
Base Material: |
Al |
Size: |
1130*980*1030 Mm |
Weight: |
630KG |
Location Datum: |
±0.05mm |
Software: |
Catia, UG, CAD, STP |
Front Cover Of Automotive Special Automized Welding Jig Fixture
Datum Pins will be spring loaded taper pins where possible, concerned engineer needs to be consulted if designer intent to have it any other kind. All tapered datum pins must check off shear where possible, have angle between 5-10º and make sure part located and secure properly.
These locators should have a good slide action with no side play. Spring force should be appropriate to provide a good positive location. Before clamping taper locators should hold part level and part should be held 2mm to 5 mm above the datum surface.
All features (holes, slots, extruded dimples etc) with size tolerance specified on the drawing must have Go/NoGo pins. Go/NoGo pins must be “Progressive” stepped “Go” then “Go/NoGo” on the same side of the pin. Pins for slots (Round or square type slots) must be separate for width and length.
All Go/No Go Pins must be set into suitable holders and should be base mounted (except for the features like extruded Dimples where difficult to see it clearly while mounted on the base) and located over the perimeter of the base. Design will allow the removal of a pin should it become necessary to repair or replace.
Each holder should have a ‘letter’ for identification label; Eurospec will identify the sizes in their Fixture instructions.
Our production detail
Items | ||
1 | Base Material | Al |
2 | Application | Stamping Parts |
3 | Surface treatment | Oxidation/Paint |
4 | Processing Precision | 0.15 |
5 | Accuracy for Other Profiles | 0.1 |
6 | Accuracy for Datum Hole | ±0.05 |
7 | Certificate | ISO 9001:2008 |
8 | CMM certification | Yes |
9 | Software | Catia, UG, CAD, STP |
10 | Specification | 630KG |
11 | Packing | Wooden Box |
Material
Base Plate: Aluminium
Main Base Frame:Steel
Components: Aluminium and Steel with heat treatment
Color
Base Plate Surface: Treated with rust-preventative oil.
Main Base Frame and Supports: Green Color
The Steel and Aluminum Parts: Black Anodized
Manufacturing tolerance
1.The Location Datum ±0.05mm
2.The Surface ±0.15mm
3.The Checking Pins and Holes ±0.1mm
Process
CNC Machining(Milling/Turning), Grinding
Black Anodized Treatment
Design Hours(h): 60h
Quality Control
CMM (3D Coordinate Measuring Machine), HR-150 A Hardness Tester
Lead time & Packing
2 months after 3D design approved
15 days via sea: HMM
Standard Export Wooden Case
Quality Policy
Legal Compliance
Customer First
Total Quality Control
System Operation
Continuous Improvement
More
We’re dedicated to providing our customers with high quality, practical, and cost-effective solutions that serve a variety of needs in the areas of checking fixtures, welding fixtures and jigs! We will work closely with customers to define their needs and assess critical design factors such as functionality, productivity requirements.
Product detail pictures:
Related Product Guide:
With our leading technology at the same time as our spirit of innovation,mutual cooperation, benefits and advancement, we will build a prosperous future with each other with your esteemed firm for Best quality Welding Jig And Fixture - Automated Welding Jig Fixture , 630kg Front Cover Weld Fixture Components – TTM , The product will supply to all over the world, such as: Poland, Florida, Burundi, We provide OEM services and replacement parts to meet the varying needs of our customers. We give competitive price for quality solutions and we are going to make certain your shipment is handled quickly by our logistics department. We sincerely hope to have the opportunity to meet with you and see how we can help you further your own business.
By April from Mombasa - 2018.09.23 18:44
The company can think what our think, the urgency of urgency to act in the interests of our position, can be said this is a responsible company, we had a happy cooperation!
By Laurel from moldova - 2017.12.09 14:01